SOI Immediately vs Delayed
NCT06286579 · Status: NOT_YET_RECRUITING · Phase: NA · Type: INTERVENTIONAL · Enrollment: 70
Last updated 2024-02-29
Summary
The aim of this randomized controlled trial is to compare the clinical and radiographic of immediately loaded, immediate (post-extractive, test group) versus delayed (control group) implants with new SOI surface
Conditions
- Dental Implant
- Dental Implant-Abutment Design
Interventions
- DEVICE
-
Immediately implant placement
After atraumatic tooth extraction immediate implant placement with SOI surface and loading will be performed with temporary restoration. After osseointegration (8 weeks), the temporary restoration will be modified according to the soft tissue management. After 3 to 4 months, a definitive digital or analog impression will be taken and later definitive restoration will be delivered
- DEVICE
-
Delayed
After atraumatic tooth extraction, the extraction site will be left to heal for 4 months, just grafting with A-Oss and suture, according to a socket preservation procedure. Four month later, implant will be place and immediate loadind with temporary restoration will be performed. After osseointegration (8 weeks), the temporary restoration will be modified according to the soft tissue management. After 3 to 4 months, a definitive digital or analog impression will be taken and later definitive restoration will be delivered
Sponsors & Collaborators
-
Melodia, Dario, M.D.
collaborator INDIV -
Pisano, Milena, M.D.
collaborator INDIV -
Dr. Aurea M. I. Lumbau
collaborator UNKNOWN -
Prof. Silvio Mario Meloni
collaborator UNKNOWN -
Prof. Edoardo Baldoni
collaborator UNKNOWN -
Università degli Studi di Sassari
lead OTHER
Study Design
- Allocation
- RANDOMIZED
- Purpose
- TREATMENT
- Masking
- SINGLE
- Model
- PARALLEL
Eligibility
- Min Age
- 18 Years
- Sex
- ALL
- Healthy Volunteers
- Yes
Timeline & Regulatory
- Start
- 2024-03-01
- Primary Completion
- 2024-12-31
- Completion
- 2028-01-31
Countries
- Italy
Study Locations
More Related Trials
-
Comparative Study of Immediate Single Unit Implants in Early Loading Protocols, With or Without Photobiomodulation.
NCT05106855 ·Status: COMPLETED ·Phase: NA
-
Clinical and Radiographic Evaluation of the Effect of Hyaluronic Acid Surface Treatment Versus Sandblasted Acid Etched on Stability of Delayed Dental Implant in Posterior Maxilla.
NCT06033989 ·Status: UNKNOWN ·Phase: NA
-
Stability of Implants With Different Surface Treatment: Randomized Clinical Trial
NCT01699568 ·Status: UNKNOWN ·Phase: NA
-
The Impact of Immediate Implant Placement on Alveolar Ridge Preservation Techniques
NCT03422458 ·Status: COMPLETED ·Phase: NA
-
Assessment of Immediate Implant Stability When Adding Mixture of Hyaluronic Acid and Melatonin
NCT03692026 ·Status: UNKNOWN ·Phase: PHASE4
-
Immediate Loading Versus Delayed Loading in Single-implant
NCT02770846 ·Status: COMPLETED ·Phase: NA
-
SA Versus SOI Surfaces for Single Implant-supported Crown
NCT04073654 ·Status: UNKNOWN ·Phase: NA
-
Osteoimplant and Dental Implants Stability
NCT06657521 ·Status: NOT_YET_RECRUITING ·Phase: EARLY_PHASE1
-
Immediate Versus Delayed Loading of Single Posterior Zirconia Implants
NCT05838365 ·Status: RECRUITING ·Phase: PHASE4
-
Immediate vs Delayed Loading of Two Implants Supporting a Mandibular Over Denture
NCT01949298 ·Status: COMPLETED ·Phase: NA
-
Effect of Placing the Implant Crown on the Implant on the Same Day as the Implant vs. 4 Weeks Later.
NCT04319042 ·Status: RECRUITING ·Phase: NA
-
Comparing the Secondary Stability of Dental Implants: Immediate Gradual Loading Versus Early Loading Protocol in Posterior Maxilla
NCT02309125 ·Status: UNKNOWN ·Phase: NA
-
A Randomized Prospective Clinical Trial Comparing Single Tooth Implant 3 Loading Protocols
NCT00607022 ·Status: COMPLETED ·Phase: NA
-
A Triple-blinded Non-inferiority Multicentre Randomized Controlled Trial Comparing Hybrid and Fully Etched Implants P1
NCT06100120 ·Status: RECRUITING ·Phase: NA
-
Esthetic, Clinical and Radiographic Outcomes of Immediate and Delayed Implant Placement
NCT02814149 ·Status: RECRUITING ·Phase: NA
-
Immediate vs Conventional Loading for Early Implant Placement
NCT06526351 ·Status: RECRUITING ·Phase: NA
-
Comparison KS Versus TS
NCT05843981 ·Status: NOT_YET_RECRUITING ·Phase: NA
-
Clinical Influence of Different Surface Treatments on Implant Stabiity
NCT06808724 ·Status: RECRUITING
-
Maxillary Molar Distalization Supported by Mini-implants With the Advanced Molar Distalization Appliance (Amda®)
NCT06011382 ·Status: UNKNOWN ·Phase: NA
-
IMMEDIATE IMPLANT With Different Types of Membranes
NCT06657651 ·Status: ENROLLING_BY_INVITATION ·Phase: NA
-
Evaluation of the Related Factors Influencing the Stability of Dental Implants
NCT02733861 ·Status: UNKNOWN
-
Evaluation of the Dimensional Alveolar Bone Changes in Immediate Post Extraction Implant Placement
NCT06515509 ·Status: COMPLETED ·Phase: NA
-
The Use of a Fully Digital Workflow in Immediate Implants With Immediate Restoration
NCT07294820 ·Status: RECRUITING
-
Influence of Timing of Implant Placement on Early Healing Molecular Events
NCT06276335 ·Status: RECRUITING ·Phase: NA
-
Early Loading of Dental Implants: A Prospective Study in the Mandibular First Molar Area
NCT02836964 ·Status: WITHDRAWN